• Bedrooms
  • Baths
  • Sq. Ft.
  • Year Built
Concrete construction, built in 2006.Just the lower level is done. Some floor tiling needed as some tiles have lifted up and there has been water seepage through the ceiling slab in some parts, but otherwise ready to move in while you build the top floor as you see fit. Lots of potential!!

Contact Us